📢 Important Date Change
This event will now take place on Wednesday 2 October 2025 (originally scheduled for 25 September).
IPFA Future Leaders Network Continental Europe
Tunnel Vision: A Site Visit of the Liefkenshoek Railway Tunnel
What does it take to build 16.2 km a freight-only railway tunnel under a tidal river – and keep trains moving through one of Europe’s busiest ports?
Built and operated under a long-term PPP model, the Liefkenshoek Railway Tunnel project tackled complex challenges including underground works beneath a tidal river, integration with existing rail infrastructure, and maintaining freight flow in Europe’s second-largest port.
Step underground with us to explore the Infrastructure Deal of the Year 2008 (PFI) and explore how future industry leaders can draw lessons in risk-sharing, collaboration, and systems thinking. Whether you're growing in finance, engineering, project delivery, or public policy, this project has something to teach the next generation shaping infrastructure’s future.
Project Presentation: Kris Laureys, Project Director, Invesis
Event Details
Registration: 5.30pm
Site Visit begins: 6.00pm
Networking: 7.00pm
Format: Guided tour followed by speech and a drinks reception
Meeting Point: Brasserie Fort Liefkenshoek : Ketenislaan 5, 9130 Beveren-Kruibeke-Zwijndrecht
Practical Info: Possibility to park at Fort Liefkenshoek where registration of the attendees will take place.
A shuttle bus will take participants from Brasserie Fort Liefkenshoek to the site (Ketenislaan Haven 1970, 9130 Kallo, Belgium).
Guided tour at the site location; 2 groups of max 15 people
After the guided tour, the shuttle bus will take participants back to Brasserie Fort Liefkenshoek for the a short presentation, social reception